
MUNICIPALITY OF AMELAND
MUNICIPALITY OF AMELAND
2 Projects, page 1 of 1
Open Access Mandate for Publications and Research data assignment_turned_in Project2020 - 2025Partners:RINA-C, EREF, COMMUNE DE BORA BORA, UNINOVA, ENGINEERING - INGEGNERIA INFORMATICA SPA +29 partnersRINA-C,EREF,COMMUNE DE BORA BORA,UNINOVA,ENGINEERING - INGEGNERIA INFORMATICA SPA,REPOWERED BV,MUNICIPALITY OF NISYROS,BAREAU BV,ETRA INVESTIGACION Y DESARROLLO SA,TNO,TERALOOP OY,SECRETARIA REGIONAL DA ENERGIA AMBIENTE E TURISMO GOVERNO REGIONAL DOS ACORES,Efacec Energia,MUNICIPALITY OF LAMPEDUSA AND LINOSA,Neroa,Hanze UAS,BeON Energy,EFACEC ELECTRIC MOBILITY, SA,EDP CNET,GASTERRA BV,SEAQURRENT,Liander (Netherlands),SUNAMP LIMITED,VPS,HELLENIC ASSOCIATION FOR ENERGY ECONOMICS,EDA,SUWOTEC BV,STICHTING NEW ENERGY COALITION,MUNICIPALITY OF AMELAND,CNR,AKUO ENERGY SAS,UBITECH ENERGY,CERTH,AECFunder: European Commission Project Code: 957810Overall Budget: 8,762,900 EURFunder Contribution: 6,999,650 EURIANOS brings together two Lighthouse (LH) islands (Terceira-PT, Ameland-NL), and three Fellow islands (FI) (Lambedusa-IT, Bora-Bora-FR, Nisyros-GR), all sharing a common vision of decarbonizing their energy systems and be energy independent until 2050. Thirty-four (33) strongly experienced partners from nine (9) European countries, join forces to deliver smart technological, economic and social innovations, providing systemic optimization starting from an Energy Community-centric approach. IANOS adopts an Island Energy Transition Strategy built around three (3) Island Energy Transition Tracks that focus on: a) Energy efficiency and grid support for extremely high RES penetration, b) Decarbonization through electrification and support from non-emitting fuels, c) Empowering Local Energy Communities (LEC). Through IANOS an impressive repository of elements (technologies, tools, methods) will be demonstrated in the two LH islands and within nine (8) carefully defined Use-Cases (UCs) that will lead to: a reduction of fossil fuel consumption by 326.4 GWh/y, an increase in RES utilization by 26.5 GWh/y, increase accuracy of vRES forecasts by >10% and reduce energy bills of end-users by >15%. In total, 900 participants (prosumers/consumers) will be involved in LECs by the end of IANOS. Elements to be demonstrated include: an iVPP operative orchestration toolkit, smart energy routers, hybrid transformers, flywheel storage, biobased batteries, heat batteries, tidal kite, and the IANOS Energy Planning and Transition Suite (IEPT). The replication potential of IANOS UCs will be evaluated in the three FIs. Due to their current local energy mix, Terceira and Ameland can particularly act as LHs for geothermal and hydrogen-centered island economies, respectively. To reach all these goals, a total of 121.6M€ will be invested by the 2 LH ecosystems, while another 60.4M€ will be fuelled by the 6 FI ecosystems during IANOS (until 2025).
more_vert Open Access Mandate for Publications and Research data assignment_turned_in Project2021 - 2025Partners:GASNAM, ACCIONA GENERACION RENOVABLE, S.A., ULL, PORT AUTHORITY OF BALEARIC ISLANDS, ENAGAS +28 partnersGASNAM,ACCIONA GENERACION RENOVABLE, S.A.,ULL,PORT AUTHORITY OF BALEARIC ISLANDS,ENAGAS,CNH2,European Marine Energy Centre,DAFNI NETWORK OF SUSTAINABLE GREEK ISLANDS,AREAM,FEDARENE,CEA,Balearia,EMT-PALMA,REDEXIS,AEU,Energy Co-operatives Ireland,UG,ENAGAS RENOVABLE SA,FHA,INSTITUT BALEAR ENERGIA,CONSULTORIA TECNICA NAVAL VALENCIANA SL,CHILEAN HYDROGEN ASSOCIATION,POWER TO GREEN HYDROGEN MALLORCA SL,STICHTING NEW ENERGY COALITION,HYENERGY TRANSSTORE BV,MUNICIPALITY OF AMELAND,AYUNTAMIENTO LLOSETA LLOSETA CITY HALL,ENER,CALVERA,UIB,HYENERGY CONSULTANCY LIMITED,HYCOLOGNE GMBH,AMHYDFunder: European Commission Project Code: 101007201Overall Budget: 23,717,200 EURFunder Contribution: 10,000,000 EURThe GREEN HYSLAND PROJECT adresses the requirements of the call FCH-03-2-2020: H2 Islands by deploying a fully-integrated and functioning H2 ecosystem in the island of Mallorca, Spain. The project brings together all core elements of the H2 value chain i.e. production, distribution infrastructure and end-use of green hydrogen across mobility, heat and power. The overall approach of GREEN HYSLAND is based on the integration of 6 deployment sites in the island of Mallorca, including 7.5MW of electrolysis capacity connected to local PV plants and 6 FCH end-user applications, namely buses and cars, 2 CHP applications at commercial buildings, electricity supply at the port and injection of H2 into the local gas grid. The intention is to facilitate full integration and operational interconnectivity of all these sites. The project will also deliver the deployment of infrastructure (i.e. dedicated H2 pipeline, distribution via road trailers and a HRS) for distributing H2 across the island and integrating green H2 supply with local end-users. The scalability and EU replicability of this integrated H2 ecosystem will be showcased via a long-term roadmap towards 2050, together with full replication studies. The intention is to expand the impact beyond the technology demonstrations delivered by the project, setting the basis for the first H2 hub at scale in Sothern Europe. This will provide Europe with a blueprint for decarbonization of island economies, and an operational example of the contribution of H2 towards the energy transition and the 2050 net zero targets The project has already been declared to be a Strategic Project by the Balearic Regional Government, and has support from the National Government through IDAE.
more_vert