Powered by OpenAIRE graph
Found an issue? Give us feedback

IRISBUS

IVECO FRANCE SA
Country: France
Funder
Top 100 values are shown in the filters
Results number
arrow_drop_down
4 Projects, page 1 of 1
  • Funder: French National Research Agency (ANR) Project Code: ANR-05-PDIT-0017
    Funder Contribution: 398,875 EUR
    more_vert
  • Funder: European Commission Project Code: 636300
    Overall Budget: 12,416,700 EURFunder Contribution: 9,995,950 EUR

    The objective of the EBSF_2 project is to validate different innovative solutions that combine efficiency of the bus system with more attractiveness. Such solutions are meant to represent the most innovative in the areas indicated by the Call: the project will proceed to their final validation before their introduction in the market, avoiding pure simulations or large use of prototypes. Following the System Approach, and with the participation of representatives of all key stakeholders categories, these activities will be introduced by the identification of innovation requirements (that will drive the impact assessment), the update of the Bus System Definition (as defined in EBSF). In addition to the impact analysis of the single solutions, the effect of combining key introduction will be evaluated. The “European Bus System of the Future" Roadmap will be updated with areas for further research and priorities linked to the project topics.

    more_vert
  • Funder: European Commission Project Code: 218647
    more_vert
  • Funder: European Commission Project Code: 101095882
    Overall Budget: 30,492,000 EURFunder Contribution: 22,776,200 EUR

    The eBRT2030 project will create a New Generation of advanced full electric, urban and peri-urban European Bus Rapid Transit (BRT) enhanced with novel automation and connectivity functionalities, to support sustainable urban transport by reducing cost/km/passenger, TCO, GHG and pollutant emissions and traffic congestion. The eBRT2030 project is developed through three main lines: 1) The development of technology-focused key innovative solutions for BRT, both at system and subsystem level, at level of vehicle, infrastructure, operation, and IoT connectivity 2) 7 demos of BRT system innovative solutions in real-operation, both city-&operator-led and BRT system-focused, or focused on specific technology innovation at subsystem level that are ready for BRT operations, in Europe and outside Europe (in Latin America and East-Africa), and fully integrated in the whole urban mobility scenario 3) the definition a new European concept of Bus Rapid Transit for year 2030, benefitting of evaluation, multiplication and replication of the real-operation test of innovations, that improve the performance of the whole European urban bus system. All cities in eBRT2030 have BRT lines already in operation or launched within 2023, and strongly committed to innovate with electrification, automation, connectivity technology tailored to the characteristics of European bus operations.

    more_vert

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.