Powered by OpenAIRE graph
Found an issue? Give us feedback

BCP

BELENOS CLEAN POWER HOLDING AG
Country: Switzerland
3 Projects, page 1 of 1
  • Funder: European Commission Project Code: 957202
    Overall Budget: 3,993,480 EURFunder Contribution: 3,993,480 EUR

    The HIDDEN project develops self-healing processes to enhance the lifetime and to increase the energy density of Li-metal batteries 50 % above the current level achievable with current Li-ion batteries. The HIDDEN consortium develops materials and their processes to functional battery layers as scalable, industry compatible, manufacturing technologies enabling sustainable energy storage technology with longer battery lifetime and higher energy storage capacity for more efficient utilization of sustainable, carbon free energy production technologies. HIDDEN will develop novel self-healing thermotropic liquid crystalline electrolytes and piezoelectric separator technologies, investigate both technologies with protective additives, and apply multiscale modelling means for electrolyte design and analysis algorithm to monitor the dendrite growth. Technologies will be upscaled from laboratory to industrial manufacturing processes, tested and finally demonstrated by assembling battery cells with battery layers and the temperature control system. The project brings together a strong interdisciplinary consortium of seven partners, industry and research balanced, with state-of-the-art background in battery chemistry and physics, materials modelling and analysis, upscaling of novel technologies by printing and coating, as well as in industrial assembling of battery cells. This is complemented by external advisory board with representation of key industry end-users.

    more_vert
  • Funder: European Commission Project Code: 325335
    more_vert
  • Funder: European Commission Project Code: 227541
    more_vert

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.