5 Projects, page 1 of 1
  • Funder: EC Project Code: 600063
    more_vert
  • Funder: EC Project Code: 646125
    Overall Budget: 13,083,100 EURFunder Contribution: 9,861,610 EUR

    Integration of distributed small/medium size storage systems can allow operating distribution grids much more flexibly, thus realizing smart grid features like local demand-supply balancing, congestion relief, peak shaving and effective RES integration. However, few technologically mature decentralized storage systems are commercially available today at affordable prices, while both viable business models and the underlying legal and regulatory framework are lagging behind. As an answer ELSA will implement and demonstrate an innovative solution integrating low-cost second-life Li-ion batteries and other direct and indirect storage options, including heat storage, demand-side management, as well as use of intermittent RES. The core idea is to consider Storage as a Service towards building and district managers for local energy management optimization, and towards DSO for enhanced network operations. ELSA will adapt, build upon, and integrate close-to-mature (TRL>=5) storage technologies and related ICT-based energy management systems for the management and control of local loads, generation and single or aggregated real or virtual storage resources, including demand response, in buildings, districts and distribution grids. Data models ensuring interoperability among building, districts and DSOs and novel business models enabled by energy storage “as-a-service” will be developed. Different configurations will be demonstrated along six test sites, where a set of different storage technologies will be integrated. Safety issues and social acceptance will be dealt with by communication and product reliability demonstration. A technical, economic and environmental validation, involving relevant stakeholders, will be carried out to nurture the European-wide replication of the ELSA concept, prepare the ground for a concrete roll out of the resulting TRL9 technologies and provide input for regulatory framework adaptation.

    more_vert
  • Funder: EC Project Code: 875126
    Overall Budget: 7,957,800 EURFunder Contribution: 7,957,800 EUR

    The project main goal is to develop new generation batteries for battery storage with a modular technology, suitable for different applications and fulfilling the increasing need of decentralised energy production and supply for private households and industrial robotised devices.. New materials and components will be developed and optimised to achieve longer lifetime (up to 10,000 cycles depending on the material selected), lower costs (down to 0.03 €/kWh/cycle), improved safety and more efficient recycling (>50%). The expected results will strengthen EU competitiveness in advanced materials and nanotechnologies and the related battery storage value chain, preparing European industry to be competitive in these new markets. This will be achieved by using high capacity anodes coupled with cobalt free cathode and with a very safe gel polymer electrolyte separator, leveraging partners’ knowledge in advanced materials. This new technology will be developed up to a TRL 6 (large prismatic cell ESP-Cell 30Ah) at the end of the project, producing these novel high voltage high capacity batteries close to practical applications. Further, the proposed solution will allow Europe to become more independent from raw material and the feasibility of a metal recovery process will be deeply investigated and recommendations for future application will be made. To achieve the ambitious targets, the CoFBAT project covers the entire value chain, bringing together industrial experts in material development and battery science together with engineering companies and institutes and battery producers and integrators.

    visibility52
    visibilityviews52
    downloaddownloads27
    Powered by Usage counts
    more_vert
  • Funder: EC Project Code: 731205
    Overall Budget: 17,595,500 EURFunder Contribution: 13,854,200 EUR

    WiseGRID has two intertwined and equally important strategic goals: on the one hand, it aims at successfully putting in the market, within a horizon of 24 months after project completion, a set of solutions and technologies which increase the smartness, stability and security of an open, consumer-centric European energy grid, with an enhanced use of storage technologies and a highly increased share of RES. On the other hand, the project intends to have a significant impact in the business and innovation activities of the consortium -with a planned ROI for the partners of less than 30 months after commercialisation of WiseGRID products and services starts- and the European sector at large, contributing to the creation of jobs, the access to new energy services of citizens and public/private organisations, the saving of CO2, and the increase of of RES, among other impacts. The achievement of these strategic goals will involve the four aspects addressed by LCE-02-2016: (a) Demand Response, (b) Smartening the Distribution Grid, (c) Demonstrating Energy Storage Technologies and (d) the Smart Integration of Grid Users from Transport. WiseGRID technologies and solutions will be packed within 9 different products, the impact of which will be demonstrated under real life conditions in 4 large scale demonstrators –in Belgium, Italy, Spain and Greece-. In order to facilitate the assessment of the performance, transferability and scalability of these solutions, the demonstrations will be conducted following 7 high level use cases.

    visibility187
    visibilityviews187
    downloaddownloads237
    Powered by Usage counts
    more_vert
  • Funder: EC Project Code: 680708
    Overall Budget: 7,900,340 EURFunder Contribution: 6,675,030 EUR

    Measurement campaigns have shown major discrepancies in buildings energy performance between planned energy demand and real energy consumption, while nowadays most of the newly constructed offices buildings are equipped with BMS systems, integrating a more or less extended measurement layer providing large amounts of data. Their integration in the building management sector offers an improvement capability of 22 % as some studies demonstrate. The HIT2GAP project will develop a new generation of building monitoring and control tools based on advanced data treatment techniques allowing new approaches to assess building energy performance data, getting a better understanding of building’s behaviour and hence a better performance. From a strong research layer on data, HIT2GAP will build on existing measurement and control tools that will be embedded into a new software platform for performance optimization. The solution will be: - Fully modular: able to integrate several types and generations of data treatment modules (different algorithms) and data display solutions, following a plug and play approach - Integrating data mining for knowledge discovery (DMKD) as a core technique for buildings’ behaviour assessment and understanding The HIT2GAP solution will be applied as a novel intelligent layer offering new capability of the existing BMS systems and offering the management stakeholders opportunities for services with a novel added value. Applying the solutions to groups of buildings will also allow to test energy demand vs. local production management modules. This will be tested in various pilot sites across Europe. HIT2GAP work will be realized with a permanent concern about market exploitation of the solutions developed within the project, with specific partnerships about business integration of the tools in the activity of key energy services partners of the consortium.

    visibility3K
    visibilityviews3,457
    downloaddownloads4,151
    Powered by Usage counts
    more_vert
Powered by OpenAIRE graph
Found an issue? Give us feedback

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available